PT - JOURNAL ARTICLE AU - Jalairov, Assylkhan AU - Kumar, Dauren AU - Nuruldaeva, Gulzhan AU - Kassymkanova, Khaini-Kamal AU - Kumar, Bakdaulet AU - Zhalgasbekov, Yermek TI - Inspection and Preparation for Testing of the Road Overpass of the Almaty-Kapshagai Highway after the Vehicular Impacts DP - 2022 Oct 26 TA - Communications - Scientific Letters of the University of Zilina PG - D160--D173 VI - 24 IP - 4 AID - 10.26552/com.C.2022.4.D160-D173 IS - 13354205 AB - The 33.0 m long reinforced concrete bridge beams of the overpass superstructure after vehicular impacts were taken as a research object.The overpass consists of 14 beams, six of which were repaired by restoring the widened lower part with EMACO FAST TIXO, manufactured by BASF.The remaining 8 beams were completely dismantled and replaced with new ones. The new beams have been fully tested for the perception of vehicular loads. The fully reconstructed span structure showed compliance with the design loads of A14, NK-120 and NK-180 based on test results.