RT Journal Article SR Electronic A1 Jalairov, Assylkhan A1 Kumar, Dauren A1 Nuruldaeva, Gulzhan A1 Kassymkanova, Khaini-Kamal A1 Kumar, Bakdaulet A1 Zhalgasbekov, Yermek T1 Inspection and Preparation for Testing of the Road Overpass of the Almaty-Kapshagai Highway after the Vehicular Impacts JF Communications - Scientific Letters of the University of Zilina YR 2022 VO 24 IS 4 SP D160 OP D173 DO 10.26552/com.C.2022.4.D160-D173 UL https://komunikacie.uniza.sk/artkey/csl-202204-0009.php AB The 33.0 m long reinforced concrete bridge beams of the overpass superstructure after vehicular impacts were taken as a research object.The overpass consists of 14 beams, six of which were repaired by restoring the widened lower part with EMACO FAST TIXO, manufactured by BASF.The remaining 8 beams were completely dismantled and replaced with new ones. The new beams have been fully tested for the perception of vehicular loads. The fully reconstructed span structure showed compliance with the design loads of A14, NK-120 and NK-180 based on test results.