Communications - Scientific Letters of the University of Zilina 2003, 5(1):76-83 | DOI: 10.26552/com.C.2003.1.76-83

Quality Assessment of Construction Schedules

Roman Marcinkowski1
1 Institute of Military Engineering, Military University of Technology, Warsaw, Poland

Preparing a schedule is a creative activity. Depending on the planner's imagination and inventiveness different visions of the plan of the same project are created. At this stage it is worth asking which plan is the best, with which scenario for the works execution the effect of the contractor's construction operation is the most desirable. This article presents a formalized method of construction schedules' quality assessment. Its methodical basis is constituted by the model of production scheduling process in a construction execution unit. The assessment of schedules is referred to the absolute scale (in interval 0,1) and is objectified using the costs of realization means outage.

Keywords: no keywords

Published: March 31, 2003  Show citation

ACS AIP APA ASA Harvard Chicago Chicago Notes IEEE ISO690 MLA NLM Turabian Vancouver
Marcinkowski, R. (2003). Quality Assessment of Construction Schedules. Communications - Scientific Letters of the University of Zilina, 5(1), 76-83. doi: 10.26552/com.C.2003.1.76-83
Download citation

References

  1. JAWORSKI, K. M.: "Wielokryterialna analiza jako¶ci harmonogramów budowlanych." [Multi-criterial analysis of construction schedules' quality] Przegl±d Budowlany, No 1, Jan. 2002.
  2. JAWORSKI, K. M.: Metodologia projektowania realizacji budowy. [Methodology of designing construction execution] Warszawa: PWN, 1999.
  3. Informatyka stosowana w inżynierii produkcji budowlanej. [Applied informatics in construction production engineering] Ed. O. Kaplinski. Poznan: Wydawnictwo Politechniki Poznańskiej, 1996.
  4. MARCINKOWSKI, R.: "Problemy planowania działań inżynieryjnych w sytuacjach kryzysowych." [Problems of planning engineer operations in crisis situations] Conference proceedings - Technologiczne, organizacyjne i ekonomiczne aspekty rozwoju budownictwa [Technological, organizational and economic aspects of the development of construction] Olsztyn: Uniwersytet Warmińsko-Mazurski, 2002.
  5. ZIELIŃSKI, B.: Microsoft Project 98. Zarz±dzanie przedsięwzięciami. [Project management] Warszawa: Wyd. MIKOM, 2000.

This is an open access article distributed under the terms of the Creative Commons Attribution 4.0 International License (CC BY 4.0), which permits use, distribution, and reproduction in any medium, provided the original publication is properly cited. No use, distribution or reproduction is permitted which does not comply with these terms.